Upcoming Events

MARK YOUR CALENDARS

—

SOMERSET CONDOMINIUMS ASSOCIATION

BOARD OF DIRECTORS MEETING

Sunday, July 19, 2026
4:30 p.m. (MT)
via Zoom

This meeting will be held remotely as a Zoom meeting.

Contact the Somerset Office for meeting access information.

All Association members are invited to attend this meeting.

—

Rules & Regulations Study Committee

Owner input invited.

See proposed amendment developments
in the Governing Documents section of this website.

—

2019–2026
CAPITAL IMPROVEMENT PROJECTS

—

2019–2020 Elevated Walkway
and Staircase Systems
Structural Engineering Analysis
and Major Renovations

Project 100% completed.

Click here to visit the Somerset Elevated Walkway & Staircase Renovations Information Site

—

2020–2021 Elevator Modernization
All new controls, electronics, oil reservoir, door detectors,
and landing heat/fire systems installed.
Associated building infrastructure upgraded and
elevator machine room rebuilt to current code.

Project 100% completed.

—

2022 Lobway Reconstruction
Ground Floor Lobby
and Walkway Renovations
New lobby deck and groundfloor walkway
(lobway) constructed.

Project 100% completed.

—

2022 Garage Lighting Renovations
Extensive night-time lighting system planned and installed.

Project 100% completed.

—

2022 East Building Roof
Complete Replacement
(1576 – 1598 Bradley)
Complete EPDM Ballast and Roof Removal.
Installation of New Insulation, Taper System,
DuroLast 60mil. PVC Roofing, and Skylights.

Project 100% completed.

—

2023 Landscape Drainage System Rebuilt
New French drain system excavated and installed
on west side of south building.

Project 100% completed.

—

2023 North/South (west) Building Roof
Complete Replacement
(1530 – 1574 Bradley)
Complete Roof Removal and Reconstruction to current code.
Installation of New Insulation, Taper System,
DuroLast 60mil. PVC Roofing, and Skylights.

Project 100% completed.

—

2023 Outdoor Lighting Systems – Replacement
Upgrade outdoor dusk-to-dawn sensors,
conduit, outlets, and wiring system.
Replace all dusk-to-dawn industrial dome lighting
with dark-sky-compliant LED lighting.

Project 100% completed.

—

2023 Elevator Hydraulic Jack – Replacement
Remove old hydraulic jack components.
Excavate and clean jack hole, located
30 feet in ground underneath elevator shaft.
Install new custom-built hydraulic jack system.

Project 100% completed.

—

2023 Level 3: Exterior Wooden Walkways
Decking, and Wooden Handrails – Repair and Refinish
Sand, repair/replace, power-wash, and stain
Level 3 exterior decks, walkways, and handrails.

Project 100% completed.

—

2024 Levels 1 and 2: Exterior Wooden Walkways
Decking, and Wooden Handrails – Repair and Refinish
Sand, repair/replace, power-wash, and stain
Level 1 and Level 2 exterior wooden decks, walkways, and handrails.

Project 100% completed.

—

2024–2025 Trash Enclosure Reconstruction
Demolition and Reconstruction, November, 2024 – February 2025.
Restoration of adjacent property and damaged parking area scheduled for 2026.

Trash Enclosure Structure Reconstruction completed February 2025

—

2026 Asphalt Repaving of Parking Lot
Remove pavement damaged during trash enclosure reconstruction.
Replace parking lot with new asphalt pavment.

Project 100% completed.

—

2026 Restoration of Trash-Enclosure-adjacent Landscape
Clear construction debris field from property surrounding trash enclosure.
Replace damaged landscape with new compatible components.

Project scheduled for July 2026

—



Website content copyright 2026, Somerset Condominiums Association

,