SOMERSET CONDOMINIUMS ASSOCIATION

BOARD OF DIRECTORS SPECIAL MEETING

Purpose: Discuss Farmer's Insurance
Engineering Recommendations and Solutions

Saturday, October 24, 2026
5:30 p.m. (MT)
via Zoom

—

Rules & Regulations Study Committee

Owner input invited.

See proposed amendment developments
in the Governing Documents section of this website.

—

2019–2026
CAPITAL IMPROVEMENT PROJECTS

—

2019–2020 Elevated Walkway
and Staircase Systems
Structural Engineering Analysis
and Major Renovations

Project 100% completed.

—

2020–2021 Elevator Modernization
All new controls, electronics, oil reservoir, door detectors,
and landing heat/fire systems installed.
Associated building infrastructure upgraded and
elevator machine room rebuilt to current code.

Project 100% completed.

—

2022 Lobway Reconstruction
Ground Floor Lobby
and Walkway Renovations
New lobby deck and groundfloor walkway
(lobway) constructed.

Project 100% completed.

—

2022 Garage Lighting Renovations
Extensive night-time lighting system planned and installed.

Project 100% completed.

—

2022 East Building Roof
Complete Replacement
(1576 – 1598 Bradley)
Complete EPDM Ballast and Roof Removal.
Installation of New Insulation, Taper System,
DuroLast 60mil. PVC Roofing, and Skylights.

Project 100% completed.

—

2023 Landscape Drainage System Rebuilt
New French drain system excavated and installed
on west side of south building.

Project 100% completed.

—

2023 North/South (west) Building Roof
Complete Replacement
(1530 – 1574 Bradley)
Complete Roof Removal and Reconstruction to current code.
Installation of New Insulation, Taper System,
DuroLast 60mil. PVC Roofing, and Skylights.

Project 100% completed.

—

2023 Outdoor Lighting Systems – Replacement
Upgrade outdoor dusk-to-dawn sensors,
conduit, outlets, and wiring system.
Replace all dusk-to-dawn industrial dome lighting
with dark-sky-compliant LED lighting.

Project 100% completed.

—

2023 Elevator Hydraulic Jack – Replacement
Remove old hydraulic jack components.
Excavate and clean jack hole, located
30 feet in ground underneath elevator shaft.
Install new custom-built hydraulic jack system.

Project 100% completed.

—

2023 Level 3: Exterior Wooden Walkways
Decking, and Wooden Handrails – Repair and Refinish
Sand, repair/replace, power-wash, and stain
Level 3 exterior decks, walkways, and handrails.

Project 100% completed.

—

2024 Levels 1 and 2: Exterior Wooden Walkways
Decking, and Wooden Handrails – Repair and Refinish
Sand, repair/replace, power-wash, and stain
Level 1 and Level 2 exterior wooden decks, walkways, and handrails.

Project 100% completed.

—

2024–2025 Trash Enclosure Reconstruction
Demolition and Reconstruction, November, 2024 – February 2025.
Restoration of adjacent property and damaged parking area scheduled for 2026.

Trash Enclosure Structure Reconstruction completed February 2025

—

2026 Asphalt Repaving of Parking Lot
Remove pavement damaged during trash enclosure reconstruction.
Replace parking lot with new asphalt pavment.

Project 100% completed.

—

2026 Restoration of Trash-Enclosure-adjacent Landscape
Clear construction debris field from property surrounding trash enclosure.
Replace damaged landscape with new compatible components.

Project 100% ccompleted.

—

2026 Code-Compliance:
Electrical Outlet Additions to Building Rooftops
Installation of Outdoor General Common Element GFCI Electric Outlets
within 25 feet of all air conditioning equipment installations
on rooftops of Somerset Condominiums buildings.
For all rooftop a/c equipment, identify and label with unit numbers.

Project 100% completed.

—