Upcoming Events

MARK YOUR CALENDARS

SOMERSET CONDOMINIUMS ASSOCIATION

BOARD OF DIRECTORS MEETING

Tuesday, August 20, 2024
6:30 p.m.
(MT)
via Zoom

This meeting will be held remotely as a Zoom meeting.

Contact the Somerset Office for meeting access information.

All Association members in good standing are invited to attend
and participate in this meeting.

Rules & Regulations Study Committee

Owner input invited.

See proposed amendment developments
in the Governing Documents section of this website.

2019–2024
CAPITAL IMPROVEMENT PROJECTS

2019–2020 Elevated Walkway
and Staircase Systems
Structural Engineering Analysis
and Major Renovations

Project 100% completed.

Click here to visit the Somerset Elevated Walkway & Staircase Renovations Information Site

2020–2021 Elevator Modernization
All new controls, electronics, oil reservoir, door detectors,
and landing heat/fire systems installed.
Associated building infrastructure upgraded and
elevator machine room rebuilt to current code.

Project 100% completed.

2022 Lobway Reconstruction
Ground Floor Lobby
and Walkway Renovations
New lobby deck and groundfloor walkway
(lobway) constructed.

Project 100% completed.

2022 Garage Lighting Renovations
Extensive night-time lighting system planned and installed.

Project 100% completed.

2022 East Building Roof
Complete Replacement
(1576 – 1598 Bradley)
Complete EPDM Ballast and Roof Removal.
Installation of New Insulation, Taper System,
DuroLast 60mil. PVC Roofing, and Skylights.

Project 100% completed.

2023 Landscape Drainage System Rebuilt
New French drain system excavated and installed
on west side of south building.

Project 100% completed.

2023 North/South (west) Building Roof
Complete Replacement
(1530 – 1574 Bradley)
Complete Roof Removal and Reconstruction to current code.
Installation of New Insulation, Taper System,
DuroLast 60mil. PVC Roofing, and Skylights.

Project 100% completed.

2023 Outdoor Lighting Systems – Replacement
Upgrade outdoor dusk-to-dawn sensors,
conduit, outlets, and wiring system.
Replace all dusk-to-dawn industrial dome lighting
with dark-sky-compliant LED lighting.

Project 100% completed.

2023 Elevator Hydraulic Jack – Replacement
Remove old hydraulic jack components.
Excavate and clean jack hole, located
30 feet in ground underneath elevator shaft.
Install new custom-built hydraulic jack system.

Project 100% completed.

2023 Level 3 Walkways, Decking, and Handrails
Repair and Refinish
Sand, repair/replace, power-wash, and stain
level 3 exterior decks, walkways, and handrails.

Project 100% completed.

2024 Trash Enclosure Reconstruction

Project in planning, estimating, and review.

2024 Levels 1 and 2: Wooden Walkways, Decking, and Handrails
Repair and Refinish
Sand, repair/replace, power-wash, and stain
Level 1 and Level 2 exterior wooden decks, walkways, and handrails.

Project 50% completed.



Website content copyright 2024, Somerset Condominiums Association

,